SEWERAGE & DRAINAGE CONSTRUCTION
Essential works.
Expertly built.
Practical engineering. Experienced delivery.
Building Singapore’s underground and water infrastructure.
Tan Kah Kee drainage construction · Original Hocklim photograph
01 / 04Engineering partnerships
Built on trust.
Infrastructure experience with
Singapore’s government agencies
01 / WHO WE ARE
Experience on site.
Purpose in every project.
Construction expertise for the infrastructure beneath and around us.
Hocklim Engineering delivers sewerage and drainage construction alongside civil and geotechnical works. Our approach brings practical site experience together with flood mitigation and climate resilience expertise.
Discover our story
Recognised for green construction solutions
Winner, Most Sustainable category
Working with institutions and public agencies
02 / OUR EXPERTISE
The work that
keeps a city moving.
Sewerage, drainage and civil construction.
Practical work. Essential infrastructure.

Drainage works
Drainage upgrades, rectification and maintenance.

Civil & geotechnical
Deep excavation, slope protection and earthworks.

Flood mitigation
Flood barriers, gates and drainage interventions.
Original Hocklim project photography.
Original Hocklim photograph03 / INNOVATION IN THE FIELD
Stronger slopes.
Greener spaces.
The GeoBarrier System
A planted approach to slope protection. Distinct soil layers help divert rainwater away from the slope, reducing saturation while creating space for greenery.
How the system works
A vegetative layer sits above fine-grained and coarse-grained layers. Their different hydraulic properties create a barrier effect that redirects rainwater and helps maintain slope strength during heavy rainfall.
04 / SELECTED WORKS
Our work.
On the ground.
Original photographs from Hocklim’s project portfolio.
Real sites. Practical engineering.
BEHIND THE FINISHED WORK
Every site has
a story.

Flood mitigation at Admiralty Road West
Explore the challenge, approach and site works.

Flood mitigation at Tan Kah Kee
Explore the challenge, approach and site works.

Slope stabilisation at Furama Riverfront Hotel
Explore the challenge, approach and site works.

Flood mitigation at Tanjong Pagar
Explore the challenge, approach and site works.

Pekan Quarry floating wetlands
Explore the challenge, approach and site works.

Debris barrier at the Straits of Johor
Explore the challenge, approach and site works.

GeoBarrier at Cheng Soon Garden
Explore the challenge, approach and site works.

Original Hocklim team photograph
OUR PEOPLE
Experience shared.
Expertise built.
Meet the people behind our engineering work, research collaborations and project delivery.
Meet HocklimBuild your career with usCONSTRUCTION IN DETAIL
Real sites.
Every stage of the work.
Two original project photographs, enhanced with restrained exposure and detail adjustments. The original photographs remain available in each case study.






