The site challenges, engineering decisions and construction work behind selected projects.


CASE STUDY
Flood mitigation at Admiralty Road West
Deep excavation, live utility protection and tidal water control.

CASE STUDY
Flood mitigation at Tan Kah Kee
Additional drainage capacity with remotely operated stoplogs.

CASE STUDY
Slope stabilisation at Furama Riverfront Hotel
Five GeoBarrier terraces combining slope drainage and site access.

CASE STUDY
Flood mitigation at Tanjong Pagar
New pipe connections to relieve a drainage bottleneck.

CASE STUDY
Pekan Quarry floating wetlands
Floating wetlands and nesting platforms at Pulau Ubin.

CASE STUDY
Debris barrier at the Straits of Johor
A 1.2 km barrier protecting a floating solar farm.

CASE STUDY
GeoBarrier at Cheng Soon Garden
A planted retaining structure for a residential boundary.